Showing posts with label tug Victory. Show all posts
Showing posts with label tug Victory. Show all posts
Saturday, October 19, 2013
VICTORY/KUBER Due
Tug VICTORY and barge JAMES L. KUBER, laden with stone for the Old Ore Dock, will be arriving in Erie at around 1930 tonight.
Sunday, October 13, 2013
VICTORY/KUBER Arrive
VICTORY/JAMES L. KUBER arrived in Erie at 1400 today and docked at the Mountfort Terminal, less than fifty feed forward of J.S. St. JOHN. The duo began unloading after a short delay to rinse off residue left on the boom.

VICTORY/KUBER arriving this afternoon.

Passing the lighthouse.

In the channel.

Close up of VICTORY.

Stern view as the unit turns for the Mountfort Terminal.

Docking ahead of the St. JOHN.

Alongside and swinging the boom out.
VICTORY/KUBER arriving this afternoon.
Passing the lighthouse.
In the channel.
Close up of VICTORY.
Stern view as the unit turns for the Mountfort Terminal.
Docking ahead of the St. JOHN.
Alongside and swinging the boom out.
Saturday, October 12, 2013
VICTORY/JAMES L. KUBER Due
VICTORY/JAMES L. KUBER, laden with stone, are expected in Erie at 0930 on Sunday morning.
Wednesday, September 25, 2013
VICTORY/KUBER Due
VICTORY/JAMES L. KUBER, with stone from Cedarville, is expected to arrive Erie at 2200 on Thursday.
FRONTENAC's drydocking will be occurring in about three weeks, after Donjon Shipbuilding finishes the final hopper barge for Sterling Equipment. HERBERT P. BRAKE, which is currently on shore at Donjon, will be taking the barge out of Erie prior to FRONTENAC's arrival.
FRONTENAC's drydocking will be occurring in about three weeks, after Donjon Shipbuilding finishes the final hopper barge for Sterling Equipment. HERBERT P. BRAKE, which is currently on shore at Donjon, will be taking the barge out of Erie prior to FRONTENAC's arrival.
Sunday, August 18, 2013
VICTORY/KUBER ARRIVE
Tug VICTORY/barge JAMES L. KUBER arrived this morning around 0800 to unload stone.
Tuesday, July 23, 2013
HERBERT P. BRAKE Arrives
HERBERT P. BRAKE arrived in Erie at 2015 hours on Monday and proceeded into drydock at Donjon Shipbuilding & Repair to attach to newly-built hopper barge HUDSON. BRAKE moved the HUDSON out to the north face of the shipyard. BRAKE then moored at the West Slip in front of McKEE SONS. The tug remains there today.
When BRAKE and HUDSON depart they are bound for the New York State Barge Canal, and the barge is eventually bound for Sterling Equipment in Quincy, MA.

HERBERT P. BRAKE inbound Erie.

Stern view.

BRAKE moving HUDSON in Erie harbor as darkness falls.

VICTORY/JAMES L. KUBER inbound on July 12.

Another view.

Between the piers.

Stern view.

Another stern view of the duo.
When BRAKE and HUDSON depart they are bound for the New York State Barge Canal, and the barge is eventually bound for Sterling Equipment in Quincy, MA.
HERBERT P. BRAKE inbound Erie.
Stern view.
BRAKE moving HUDSON in Erie harbor as darkness falls.
VICTORY/JAMES L. KUBER inbound on July 12.
Another view.
Between the piers.
Stern view.
Another stern view of the duo.
Friday, July 12, 2013
UNDAUNTED/PERE MARQUETTE 41 Visit; VICTORY/KUBER in Port, Will Load Sand
UNDAUNTED/PERE MARQUETTE 41 arrived in Erie at 0100 this morning and spent the morning unloading stone at the Mountfort Terminal. The duo departed at 1230 this afternoon. This was UNDAUNTED/PERE MARQUETTE 41's first visit to Erie since 2003.
VICTORY/JAMES L. KUBER arrived in Erie at 1730 today and docked at the Old Ore Dock to unload stone from Cedarville. When finished early Saturday morning they will move to the Mountfort Terminal to load sand for the North Pier.
I will post photos Saturday.
VICTORY/JAMES L. KUBER arrived in Erie at 1730 today and docked at the Old Ore Dock to unload stone from Cedarville. When finished early Saturday morning they will move to the Mountfort Terminal to load sand for the North Pier.
I will post photos Saturday.
Thursday, July 11, 2013
Two Tug/Barge Units Due Friday
UNDAUNTED/PERE MARQUETTE 41 are expected in Erie at 0100 Friday.
VICTORY/JAMES L. KUBER, with stone from Cedarville, are due in at 1430.
VICTORY/JAMES L. KUBER, with stone from Cedarville, are due in at 1430.
Monday, May 20, 2013
VICTORY/KUBER Shuttle Sand
After arriving in Erie at 2300 on Saturday and unloading stone at the Mountfort Terminal and Old Ore Dock, VICTORY/JAMES L. KUBER moved over to the Mountfort Terminal, and docked at the east end of that pier at 0840 on Sunday. KUBER began to take on a load of sand, previously dredged from the lake bottom, via portable conveyor.
KUBER loaded until about 0930 this morning before moving over to the North Pier to unload sand for beach replenishment. This is the first dry bulk cargo loaded onto a vessel in the port of Erie in many, many years. In the early 1990s the JOSEPH H. THOMPSON loaded coke here; that is believed to be the last cargo loaded from the port of Erie.
I will update with photos later today.
KUBER loaded until about 0930 this morning before moving over to the North Pier to unload sand for beach replenishment. This is the first dry bulk cargo loaded onto a vessel in the port of Erie in many, many years. In the early 1990s the JOSEPH H. THOMPSON loaded coke here; that is believed to be the last cargo loaded from the port of Erie.
I will update with photos later today.
Sunday, May 19, 2013
KUBER LOADS SAND
After unloading last night at the Mountfort Terminal and Old Ore Dock, VICTORY/JAMES L. KUBER moved over to the Mountfort Terminal this morning and began loading sand via portable conveyors.
I will update with a full report and photos on Monday.
I will update with a full report and photos on Monday.
Saturday, May 18, 2013
VICTORY/KUBER Due
VICTORY/JAMES L. KUBER are due in Erie, with stone from Cedarville, at 2045 tonight.
Saturday, April 20, 2013
KUBER Waits, Departs
VICTORY/JAMES L. KUBER arrived in Erie at 0400 on Friday and docked at the Old Ore Dock to unload. The duo moved over to the Mountfort Terminal at 0930, and finished unloading before waiting weather after the approach of yesterday's gale. VICTORY/KUBER departed this afternoon at noon.
I will post photos of the duo on Monday.
I will post photos of the duo on Monday.
Thursday, April 18, 2013
OLIVE L. MOORE DEPARTS
After two months in drydock at Donjon Shipbuilding & Repair for engine work and an owner's inspection, OLIVE L. MOORE departed Erie this morning at 0900 bound for Toledo, Ohio. The MOORE will mate up with her barge, LEWIS J. KUBER, in Toledo and begin another season on the Great Lakes.
VICTORY/JAMES L. KUBER are still expected in Erie at around 0500 on Friday morning, weather permitting.

OLIVE L. MOORE turns enters the channel.

In between the piers.

The raised pilot house on OLIVE L. MOORE was added in 2006 in Escanaba, Michigan before the tug returned to Erie to mate up with LEWIS J. KUBER for the first time. The 1928-built MOORE has been modified numerous times over the years and this will likely be her last configuration.

Racing out the channel.

Stern view.

Outbound for Toledo.
VICTORY/JAMES L. KUBER are still expected in Erie at around 0500 on Friday morning, weather permitting.
OLIVE L. MOORE turns enters the channel.
In between the piers.
The raised pilot house on OLIVE L. MOORE was added in 2006 in Escanaba, Michigan before the tug returned to Erie to mate up with LEWIS J. KUBER for the first time. The 1928-built MOORE has been modified numerous times over the years and this will likely be her last configuration.
Racing out the channel.
Stern view.
Outbound for Toledo.
Wednesday, April 17, 2013
McKEE SONS moved; VICTORY/KUBER to be season opener
A yard crew from Donjon Shipbuilding & Repair moved INVINCIBLE/McKEE SONS back across the West Slip to Donjon at 1530 today. The duo spent the winter on the west side due to TECUMSEH's positioning during winter layup.
McKEE SONS will remain in Erie indefinitely until business on the Great Lakes warrants drydocking her and tug INVINCIBLE and completing work needed for the duo to pass a five-year survey.
VICTORY/JAMES L. KUBER, with stone from Calcite, will open Erie's season with their arrival in Erie at around 0500 Friday.

The starboard anchor on the McKEE SONS is lifted aboard at around 1430 today.

The port anchor is lifted a few minutes later.

McKEE SONS starts to move across the slip.

In the middle of the slip.

Alongside Donjon and bringing the bow wire, which was held on the west side of the slip for control, back aboard.
McKEE SONS will remain in Erie indefinitely until business on the Great Lakes warrants drydocking her and tug INVINCIBLE and completing work needed for the duo to pass a five-year survey.
VICTORY/JAMES L. KUBER, with stone from Calcite, will open Erie's season with their arrival in Erie at around 0500 Friday.
The starboard anchor on the McKEE SONS is lifted aboard at around 1430 today.
The port anchor is lifted a few minutes later.
McKEE SONS starts to move across the slip.
In the middle of the slip.
Alongside Donjon and bringing the bow wire, which was held on the west side of the slip for control, back aboard.
Wednesday, April 10, 2013
VICTORY Cruises the Bay; Layup Updates
Tug VICTORY backed away from her barge in the graving dock at Donjon Shipbuilding & Repair this afternoon at around 1445 hours and moved to the east side of the dock. VICTORY's crew spent about three hours working on the tug's engines before the tug backed away from the graving dock and turned circles in the bay to test her engines.
VICTORY docked at the West Slip, where she remains, at 1755 this afternoon.
VICTORY/JAMES L. KUBER, in for her five-year survey and other repair work, should be departing later this week. OLIVE L. MOORE, which had been in for engine work, should also be departing to return to Toledo later this week. MOORE will pick up her barge, LEWIS J. KUBER, there.

VICTORY in the graving dock this afternoon.

Turning in Presque Isle Bay.

Stern view.

VICTORY, finished with trials, turns for the West Slip.

VICTORY approaches the West Slip.

Docking.
VICTORY docked at the West Slip, where she remains, at 1755 this afternoon.
VICTORY/JAMES L. KUBER, in for her five-year survey and other repair work, should be departing later this week. OLIVE L. MOORE, which had been in for engine work, should also be departing to return to Toledo later this week. MOORE will pick up her barge, LEWIS J. KUBER, there.
VICTORY in the graving dock this afternoon.
Turning in Presque Isle Bay.
Stern view.
VICTORY, finished with trials, turns for the West Slip.
VICTORY approaches the West Slip.
Docking.
Tuesday, February 5, 2013
Two Tugs and a Barge Drydocked
OLIVE L. MOORE departed the east slip of Donjon Shipbuilding & Repair at 0630 this morning and began breaking ice in Presque Isle Bay, in preparation for the movement of several vessels at the yard this morning. OLIVE L. MOORE broke several tracks to the north of Donjon and returned to dock at 0700 this morning.
The crew on the MOORE then moved over to the tug VICTORY and began to prepare it for movement into the graving dock. After problems getting pumps on the VICTORY's engine running, the tug and barge JAMES L. KUBER began working away from the north face of Donjon at 0845, beginning the process of entering the dock bow first. The process was made more complicated by the fact that the VICTORY's port engine went down at one point during the move, forcing the captain to use one engine and the bow thruster to make the turn. VICTORY's engine came back online before the duo entered the dock.
VICTORY and JAMES L. KUBER were into position by 1130 this morning, with the tug disconnected from the barge, and the crew switched back over to OLIVE L. MOORE. MOORE then entered the dock slowly, rubbing against JAMES L. KUBER, and is docked in front of the KUBER. There are four vessels - FARREL 256, KUBER, MOORE and VICTORY - in drydock at this time, which is the most vessels ever drydocked at once at the facility.

OLIVE L. MOORE breaking ice this morning at 0645.

Close up of the 1928-built tug, which hasn't been in Erie since departing on its first trip with LEWIS J. KUBER in September 2006.

VICTORY/KUBER in the snow at 0819 this morning.

Twenty-six minutes later, the duo departs the dock in the sunlight.

Moving away from the dock.

In the bay, turning toward the dock. The duo turned several times from north to south and back again.

Turning north.

Turning south again.

Stern view of the VICTORY.

McKEE SONS and TECUMSEH in the West Slip.

Turning for the dock.

In the graving dock.

About 100 feet to go here and the duo will be in position.

MOORE departing the east slip.

Turning.

Next to the KUBER.

Alongside and scraping down the side of the JAMES L. KUBER.

Another view as MOORE approaches the bow of the KUBER.
The crew on the MOORE then moved over to the tug VICTORY and began to prepare it for movement into the graving dock. After problems getting pumps on the VICTORY's engine running, the tug and barge JAMES L. KUBER began working away from the north face of Donjon at 0845, beginning the process of entering the dock bow first. The process was made more complicated by the fact that the VICTORY's port engine went down at one point during the move, forcing the captain to use one engine and the bow thruster to make the turn. VICTORY's engine came back online before the duo entered the dock.
VICTORY and JAMES L. KUBER were into position by 1130 this morning, with the tug disconnected from the barge, and the crew switched back over to OLIVE L. MOORE. MOORE then entered the dock slowly, rubbing against JAMES L. KUBER, and is docked in front of the KUBER. There are four vessels - FARREL 256, KUBER, MOORE and VICTORY - in drydock at this time, which is the most vessels ever drydocked at once at the facility.
OLIVE L. MOORE breaking ice this morning at 0645.
Close up of the 1928-built tug, which hasn't been in Erie since departing on its first trip with LEWIS J. KUBER in September 2006.
VICTORY/KUBER in the snow at 0819 this morning.
Twenty-six minutes later, the duo departs the dock in the sunlight.
Moving away from the dock.
In the bay, turning toward the dock. The duo turned several times from north to south and back again.
Turning north.
Turning south again.
Stern view of the VICTORY.
McKEE SONS and TECUMSEH in the West Slip.
Turning for the dock.
In the graving dock.
About 100 feet to go here and the duo will be in position.
MOORE departing the east slip.
Turning.
Next to the KUBER.
Alongside and scraping down the side of the JAMES L. KUBER.
Another view as MOORE approaches the bow of the KUBER.
Subscribe to:
Posts (Atom)