Monday, November 19, 2012

A-390 Enters Drydock

At 0700 this morning, BARBARA ANDRIE backed barge A-390 out of the West Slip, and after doing a 360-degree turn in the harbor, entered the drydock at Donjon Shipbuilding & Repair.

A-390 will be in the drydock for survey for the next few weeks, next to FARRELL 256. BARBARA ANDRIE, after backing out of drydock, docked at the West Slip, where it will remain while the barge is in drydock.


BARBARA ANDRIE/A-390 turning in Erie harbor.


Coming around. The tug and barge turned to back in originally before finding out that they were supposed to go in bow-first so the tug could get out of the drydock.


The tug comes forward on its engine to swing around the barge.


Turning for the drydock.


A-390 comes alongside the graving dock.


Moving forward.


Tug BARBARA ANDRIE enters the West Slip.


Stopping.


BARBARA ANDRIE secured at dock this afternoon.


Stern view.

No comments: