SONGA PEARL arrived in Erie in ballast from Sarnia this morning at around 0530, turned in Erie harbor and docked at the Mountfort Terminal. Shortly thereafter Lakeshore Towing deployed the oil-containment boom around the vessel and following Coast Guard inspection loading of the biodiesel, produced by Lake Erie Biofuels, began this morning.
The 2008-built SONGA PEARL will be in Erie until sometime tomorrow loading biodiesel.
SONGA PEARL at the Mountfort Terminal this morning.
Another view.
With the railcars full of biodiesel next to her, the PEARL loads.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment