Saturday, May 12, 2012

BRADSHAW McKEE/CLEVELAND ROCKS Depart; THOMPSON DUE

BRADSHAW McKEE and barge CLEVELAND ROCKS shifted to the north face of Donjon Shipbuilding and Repair this morning at around 1030 hours. McKEE/CLEVELAND ROCKS departed Erie this afternoon at 1330 bound for Marblehead, Ohio to load stone. The pair is currently making a speed of 7.6 knots abeam of Fairport Harbor, Ohio.

J.S. St. JOHN will be moved from drydock sometime on Monday. Tuesday or Wednesday JOSEPH H. THOMPSON/JOSEPH H. THOMPSON JR. will be arriving for drydocking.




BRADSHAW McKEE backing away from Donjon at 1030 this morning.


Turning.


A flyover as the ROCKS docks.


Outbound this afternoon.


Close up.


BRADSHAW McKEE in the notch.


Stern view.


Clearing the Piers.

2 comments:

Isaac said...

Is the barge actually longer than it was before?

Jeff Thoreson said...
This comment has been removed by the author.