Elsewhere in port, J.S. St. JOHN made its first run of the 2010 season into Lake Erie to dredge sand today, and was inbound for the Mountfort Terminal at 1440 hours.
Assembled docks lifted into the water.
Preparing to lift a section of dock into the water.
Lifting the dock.
Another view.
One section of dock in the water.
These docks have already been floated into place.
No comments:
Post a Comment